SK Siddharth Karandikar
Brief

Siddharth Karandikar · Strategy & engineering

Most problems are only hard at the wrong resolution.

I'm a final-year Electronics & Telecommunication engineer who does strategy work. At Godrej Properties that meant a 553-component cost master, and ₹178 crore of a ₹183 crore savings proposal approved. In January 2027 I join Searce as an AI Solutions Consultant.

Selected work

I find money by breaking things down further than anyone had.

A cost base split into 553 components, a market read from seven years of customs records, an overseas entry taken in stages. Each time, the answer appeared at a finer resolution than the one people were arguing at.

Exhibit 1

97% of the savings proposal was approved

₹183 Cr
−₹5 Cr
₹178 Cr
ProposedNot approvedApproved

Hover, tap or tab to a bar for its value.

Source: Godrej Properties, 2026 — approved savings against the proposal

Leadership and earlier work

The technical edge

I can tell which parts of a pitch are physics.

More of the problems strategy teams are hired for now have technology inside them: an operator's network spend, a bank's payment rails, an AI rollout. I have built in those systems, so I can read the technical half of the business case instead of taking it on trust.

Why this matters for clients

One line, one turn

Two threads since 2024, both pointing at the same job.

In 2024 I spent six months building a startup and found that the part I wanted was reading a business from the outside. The engineering did not stop; the hardest radio work came after. A second thread started beside it.

Career path: 15 projects on one line that forks into engineering and commercial threads in 2024 and rejoins at Searce in January 2027 2024 2025 2026 2027 ENGINEERING COMMERCIAL THE TURN · 2024 SEARCE JAN 2027
15 projects, one turn Everything up to TimeWarp ran on one track. After it the engineering did not stop; a commercial thread started beside it, and both lead to the same next step.
Engineering Commercial The turn Larger dots are case studies · select one to open it
  1. Before the turn MindSpark Sponsorship for a ₹30 lakh festival. The first commercial work. Aug – Oct 2023.
  2. Before the turn Police workstation User research for traffic police. The constraint was a place to work, not equipment. Jan – May 2024.
  3. Before the turn B-ABLE programme A hundred students taught, once the permissions were secured. 2024.
  4. The turn TimeWarp Six months building a startup and pitching it to angel investors. The turn toward strategy. 2024.
  5. Commercial CEO Challenge Rural banking built on the assumption of no connectivity. First place. Jan 2025.
  6. Engineering COEP 5G Lab ₹40 lakh of government funding brought onto campus. Jan – Apr 2025.
  7. Engineering Banking over 5G slices Half a million payments pushed through network slices to find the failure point. 2025.
  8. Engineering Automotive ECU A control unit validated on a bench, with no vehicle attached. Feb – May 2025.
  9. Commercial Sparkonix ₹30 Cr of untapped demand found in seven years of import data. May – Jul 2025.
  10. Engineering EEG seizure detection Clinical sampling timing held on a commodity microcontroller. Jul – Dec 2025.
  11. Commercial Pune Startup Fest Investor commitments up 54%, on the strength of a screening funnel. Sep 2025 – Jan 2026.
  12. Engineering OTFS-ISAC research Reproduced a framework published without code, and corrected three of its results. 2026.
  13. Engineering O-RAN congestion prediction A model trained in simulation and tested on real network data. 2026, ongoing.
  14. Commercial Godrej Properties ₹178 Cr of a ₹183 Cr savings proposal approved. May – Jul 2026.
  15. Commercial Overseas market entry A staged foreign market entry, currently live. 2026.
  16. Next · Jan 2027 AI Solutions Consultant, Searce Where both threads meet.